Drainage
& SuDS
Below-ground drainage and sustainable drainage systems designed to manage surface water responsibly, from attenuation tanks to soakaways and permeable surfacing.
Drainage and SuDS contractor managing surface water responsibly
Modern planning conditions increasingly require sustainable drainage systems (SuDS) that manage surface water at source rather than simply piping it away. Lawday installs foul and surface water drainage, attenuation tanks, soakaways and permeable surfacing, working alongside consulting engineers to coordinate SuDS design with the wider site strategy.
Every installation is backed by CCTV survey and connection testing, giving clients confidence that below-ground drainage will perform for the life of the asset – from retail and education sites through to heritage-sensitive locations where surface water has to be managed without disturbing the setting.
What’s included
Every groundworks package starts with a clear sequence: clearance and enabling, then foundations and substructure, then sub-base and hardstanding, with utilities coordinated throughout. Our in-house teams carry that sequence from first strip to final compaction test, so there’s one point of accountability rather than a chain of subcontractors.
Every groundworks package starts with a clear sequence: clearance and enabling, then foundations and substructure, then sub-base and hardstanding, with utilities coordinated throughout. Our in-house teams carry that sequence from first strip to final compaction test, so there’s one point of accountability rather than a chain of subcontractors.
- Site clearance & vegetation removal
- Demolition & muckaway
- Foundations & hardstanding
- Sub-base construction & compaction testing
- Utilities coordination & statutory diversions
- Kerbing & drainage connections
Foul & surface water drainage installation
Below-ground pipework, manholes and connections installed to adoptable and Building Regulations standards.
Attenuation tanks & soakaway systems
Attenuation and soakaway systems sized and installed to agreed drainage strategies, reducing discharge to greenfield rates.
SuDS design coordination
Close coordination with the project’s drainage engineer to keep SuDS features buildable and on programme.
CCTV survey & drainage connections
Pre- and post-installation CCTV survey, with connections tested and recorded for handover.
Our approach
01
Survey & Design
CCTV survey and SuDS design coordination with consulting engineers.
02
Below-Ground Installation
Attenuation tanks, soakaways and drainage runs.
03
Testing & Connections
Connections, pressure testing and statutory sign-off.
04
Handover
As-built records and drainage handover documentation.
Sectors we
deliver this in
Drainage & SuDS delivered across the following sectors.
Facilities Management
Heritage
Retail
Education
Healthcare
Highways
What We Do
What’s included
What’s included
Awards And Recognitions
We’ve won several awards and were featured in these shows and magazines.
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
Recent Work
Related
Case Studies
Proud of Our Loyal and Constantly
Growing Customer Base
2018
DevStack Launched
1.6M+
Community Members
170.000+
Customers