Resin & Surfacing Solutions
Resin bound surfacing, tarmac resurfacing and car park schemes for retail, education and facilities management clients – completed with minimal disruption to live sites.
Resin bound surfacing and car park resurfacing with minimal disruption
Surfacing works are often the most visible part of a project to the end user, whether that’s shoppers, pupils or hospital visitors. Lawday delivers resin bound surfacing, tarmac resurfacing and full car park resurfacing schemes for retail, education and facilities management clients, phasing works to keep sites trading, teaching and operating throughout.
Alongside surfacing we install Armco barriers and bollards, re-line car parks and refresh signage – giving clients a single contractor for the complete external-works package on live commercial sites.
What’s included
Every groundworks package starts with a clear sequence: clearance and enabling, then foundations and substructure, then sub-base and hardstanding, with utilities coordinated throughout. Our in-house teams carry that sequence from first strip to final compaction test, so there’s one point of accountability rather than a chain of subcontractors.
Every groundworks package starts with a clear sequence: clearance and enabling, then foundations and substructure, then sub-base and hardstanding, with utilities coordinated throughout. Our in-house teams carry that sequence from first strip to final compaction test, so there’s one point of accountability rather than a chain of subcontractors.
- Site clearance & vegetation removal
- Demolition & muckaway
- Foundations & hardstanding
- Sub-base construction & compaction testing
- Utilities coordination & statutory diversions
- Kerbing & drainage connections
Resin bound surfacing & soft-surface access
Permeable resin bound surfacing installed for pathways, car parks and soft-surface access routes.
Car park resurfacing & re-lining
Full car park resurfacing schemes including planing, patch repairs and re-lining, phased to keep sites operational.
Armco barrier & bollard installation
Armco barriers and bollards installed to protect pedestrians, buildings and parking bays.
Line marking & signage
Thermoplastic and paint line marking with new and replacement signage to current standards.
Our approach
01
Site Survey
Site survey and specification against live-site constraints.
02
Preparation & Sub-base
Planing, sub-base repair and preparation.
03
Surfacing & Lining
Resin or tarmac surfacing, barriers and line marking.
04
Live-Site Handback
Phased handback to minimise disruption to operations.
Sectors we
deliver this in
Resin & Surfacing Solutions delivered across the following sectors.
Facilities Management
Heritage
Retail
Education
Healthcare
Highways
What We Do
What’s included
What’s included
Awards And Recognitions
We’ve won several awards and were featured in these shows and magazines.
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
Recent Work
Related
Case Studies
Proud of Our Loyal and Constantly
Growing Customer Base
2018
DevStack Launched
1.6M+
Community Members
170.000+
Customers









